This is a current project that I have been working on for a couple of months now. Basically, it is being done as I can afford to buy the parts. These pictures are not in any real order. They are just various pics I have been taking while building.
|
Sealing inside of pump ends where the wood flanges fit over the steel tabs |
Building wooden flanges |
Sealing the outside of the pump flanges with fiberglass resin
|
Fitting the metal flange strips on the pump ends
|
Metal flange strips with 38 holes per strip! |
flanges brazed on – inside and outside
|
Engine drums and start of frame |
Poor view of inside brazing
|
View of pump end plumbing connections |
Side view of crank shaft shaft mounted on frame
|
Crank shaft before main axle mounted |
drums and crossbar mounted
|
View of engine drum with brazed flange strip and plumbing connections
|
Piston rod crossbar connectors
|
Piston rods and diaphram plates |
Fabrication of diaphrams. One layer of 1/4″ thick nitril gasket rubber between two layers of t-shirt material glued on and covered with high temp automotive type silicone gasket material |
Current view of work done on engine |
Flow diaphram of current engine |
My high tech wheel mount for the rim and tire flywheel
|
View with wheel mounted |
I got the engine to work but I couldn’t supply enough hot water with the panels I was using. I could only get a few rpm. If a good source of used hot water was available the engine would operate much faster.
|